Whole cycle, one contractor
From excavation and the concrete shell through pipe installation, mechanical works and commissioning — all of it is our own crews. The client does not need a separate contractor to hold the interfaces together.

Since 2016 we have been building water intakes, tunnels, trunk mains, collectors and wastewater treatment plants — from earthworks through to commissioning.
Upper Shirvan Canal, water intake structure — Yevlakh
Totals across nine projects

Complexes from 3,000 to 40,000 m³/day: mechanical and biological treatment blocks, clarifiers, sludge handling, process equipment installation and commissioning.
See projects
Steel up to DN1600, reinforced concrete up to Ø2000 and CHDPE up to Ø1400. Excavation, bedding, weld and pressure testing, valve and air-release chambers.
See projects
Water intakes, tunnel barrels, outlet structures and canal crossings. Monolithic reinforced concrete, retaining walls, gate chambers and multi-layer waterproofing.
See projects
Wastewater and clean-water pumping stations, valve assemblies, pipeline fittings, electric actuators and controls — complete installation and testing.
See projects


From excavation and the concrete shell through pipe installation, mechanical works and commissioning — all of it is our own crews. The client does not need a separate contractor to hold the interfaces together.
A DN1600 steel main, a Ø2000 reinforced-concrete storm collector, a Ø1400 CHDPE sewer — all laid and in service. At these diameters the plant, the lifting scheme and the weld control are nothing like an ordinary line.
A mountain slope in Dashkasan and Gadabay, a city under reconstruction in Aghdam, riverside groundwater in Yevlakh. None of our sites has been a flat, dry field.
Send the tender documents or the technical brief — we will assess the quantities and come back to you.