Portfolio
Projects
Nine sites delivered or under way since 2016. Each entry carries the contract date, the location and the quantities executed.
Category
9 projects
Status

Upper Shirvan Canal: tunnel and outlet structure
Concrete works
59000m³
Reinforcement
1900t
Waterproofing
32000m²

Upper Shirvan Canal: water intake structure
Concrete works
14000m³
Reinforcement
1005t
Waterproofing
2500m²

Jeyranbatan — Atyali DN1600 steel trunk main
Length of line
10400lin. m
Excavation
217500m³
Backfill
159100m³

Aghdam: Ø1400 sewer and Ø2000/1800 storm water lines
Ø1400 CHDPE SN8 pipe installation
2726lin. m
Ø2000 reinforced-concrete storm pipes
2707lin. m
Ø1800 reinforced-concrete pipe installation
237lin. m

Deluxe Park Qusar: sewer line and pumping station
Pipeline
1900lin. m
Excavation
4000m³
Pumping station
Q=30m³/saat,H=60m

Pirshaghi wastewater treatment plant
Capacity
40000m³/day

Qazakh wastewater treatment plant
Capacity
10500m³/day

Gadabay wastewater treatment plant
Capacity
3500m³/day

Dashkasan wastewater treatment plant
Capacity
3000m³/day
No projects match these filters.